Each contractor
shall
move
Open status potential duplicate claim sets
to
Pending,
Validate, or
Closed status
on a first-in/first-out basis. To this end, contractor performance
is measured
by the
percentage of claim sets in
Open status
moved
with respect to the total inventory set count for the month.
Specifically,
contractors shall move at least 90% of sets in the monthly inventory
from
Open status
by the
end of a month
.
The monthly
load will be run no later than the 10th day of the month. Contractors will
have access to the sets from the monthly load the day following
verification by the Government Designated Authority (GDA). The contractor
compliance with this standard shall be determined from the Performance
Standard Report generated by the DCS (see
Addendum B,
Summary Management Report titled “Performance Standards”, for a
description and example of the Performance Standard Report). The
standard
becomes effective on the first day of the seventh month following
the start of services or following system installation whichever
is later.